Protect the build from day one. We install termite barriers under and around the slab before construction goes up.

The cheapest time to termite-proof a home is before it is built. Pre-construction barriers are installed during the slab stage and integrated into the structure, giving lasting protection that is impossible to retrofit as cleanly later.
We work to the relevant Australian Standard and provide the certification builders and certifiers need for sign-off.
At slab stage, before the concrete is poured and while services penetrations are exposed. We work to your builder's schedule so the barrier is in place at exactly the right point.
Barriers are installed to the relevant Australian Standard for termite management in new building work (AS 3660.1), and we provide the documentation your builder and certifier need.
That depends on the system. Some physical barriers are designed to last the life of the building, while chemical systems need periodic maintenance. We'll explain the options before the slab goes in.
Talk to Allan/Tahir for a straight answer and a fixed price, usually within one business day.
Thanks. We have received your request and will get back to you within one business day.